Bailey bridge installation begins over Tadi River in Nuwakot
Onlinekhabar1 newsroom
Picture: Onlinekhabar
Kathmandu, September 6 The installation of a Bailey bridge over the Tadi River at Devighat Bazaar in Nuwakot began on Saturday, with the Nepal Army starting the construction work. The bridge will reconnect Devighat Bazaar with Jiling, which have remained disconnected after a permanent bridge was swept away by a massive flood in the Bhotekoshi […] The post…