Cable crossing installed over Trishuli River to reconnect two Nuwakot wards
Onlinekhabar10h ago1 newsroom
Kathmandu, September 1 A cable crossing has been installed over the Trishuli River to facilitate travel between Ward 1 and Ward 9 of Bidur Municipality in Nuwakot. The connection between the two wards was cut off following the devastating floods in the Bhotekoshi River on August 26. The cable crossing was installed on Tuesday morning […] The post Cable…