Chitwan, September 6 A track opened above Krishnabhir along the Prithvi Highway to transport construction materials and equipment is being widened as preparations continue to reopen the road section blocked by a landslide. The track was opened after trees and bushes were cleared from the upper section of the landslide site, allowing access for construction…