The pipeline upgrading works from Munroe Road to Wellington Drive are shifting to night-time operations, with the corridor closing almost entirely on Sundays to allow for up to 24-hour construction. The move is part of measures to minimise traffic congestion, particularly with the reopening of schools on Monday. “We want to assure residents that after this…